DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›New Solution for Abercorn Creek
Business & Finance

November 2, 2014 · about 11 years ago

New Solution for Abercorn Creek

Understanding the reverberating environmental impacts of the Savannah Harbor Expansion Project has been a sizable undertaking for the Corps’ and its partners. Preserving high water quality standards is at the forefront of the Corps’ efforts to minimize adverse environmental effects that may result f

2 minutes read
  • LinkedIn
  • X
  • Email

Understanding the reverberating environmental impacts of the Savannah Harbor Expansion Project has been a sizable undertaking for the Corps’ and its partners. Preserving high water quality standards is at the forefront of the Corps’ efforts to minimize adverse environmental effects that may result from the expansive project.

By deepening the Savannah River to the Garden City terminal, slightly elevated levels of salinity may extend further upstream, increasing chloride concentrations in Abercorn Creek which is a vital water source for Savannah residents and local industries.

Studies indicate that extreme spring high tides combined with drought conditions – such as when the Savannah River flow at Clyo, Georgia, falls below 4,000 cubic feet per second – could temporarily increase chloride concentrations in Abercorn Creek at high tide. If left unmitigated, the higher chloride levels could increase maintenance costs for industries and water quality for municipal users of Savannah River water.

The planned construction of a freshwater storage impoundment to store raw water solves this problem. The city’s treatment plant can use water from the impoundment on occasions when high tides and low stream flow result in higher chloride levels.

“During normal operations, all of the water withdrawn from Abercorn Creek will pass through the storage impoundment, ” said Joseph Hoke, a Savannah District civil engineer . “ This will provide an operational benefit by mixing the intake water and minimizing the twice daily fluctuations of pH and turbidity that are presently seen at the water treatment plant due to the tidal influence at the Abercorn Creek intake.”

If chloride levels climb, the city’s water treatment plant operator will turn off Abercorn Creek intake pumps and take raw water from the storage impoundment. The impoundment will serve as an intermediate holding pond for raw water from Abercorn Creek before reaching the city’s water treatment plant.

[mappress mapid=”19096″]

Press Release

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free