DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›UPDATE: Upper Hudson River Dredging Scheme
Business & Finance

November 10, 2014 · about 11 years ago

UPDATE: Upper Hudson River Dredging Scheme

The upper Hudson River dredging program, administered by the United States Environmental Protection Agency (EPA) and General Electric (GE), will be in progress during the 2014 Navigation Season between Lock C-4 in Stillwater and Lock C-8 in Fort Edward. The dredging operations are lighted, have day

1 minutes read
  • LinkedIn
  • X
  • Email

The upper Hudson River dredging program, administered by the United States Environmental Protection Agency (EPA) and General Electric (GE), will be in progress during the 2014 Navigation Season between Lock C-4 in Stillwater and Lock C-8 in Fort Edward.

The dredging operations are lighted, have day shapes and arrow boards displayed. Additional informational signs have been posted in the project area.

Activities Planned for the Week of November 10, 2014:

– Barge unloading operations immediately south of Lock C-8;

– Barge loading operations in the vicinity of buoy Red 60;

– Project hazard buoys marking shallow water areas just outside the navigational channel are located just north of buoy Green 133;

– No Wake buoys in the land cut north of Lock 6 marking the no wake zone established in the vicinity of the Isthmus Transfer Area;

– Norwegian buoys indicating shallow water areas located outside the navigational channel are located between buoy Red 68 and Red 66;

– Norwegian buoy used as a temporary mooring located outside the navigational channel is located between buoy Red 72 and Red 66;

– Norwegian buoy indicating the location of a submerged tree is located in the vicinity of buoy Red 62B;

– Backfill/capping operations between approximately buoy Red 88 and Green 77;

– Backfill/capping operations between approximately buoy Red 68 and Green 71;

– Backfill/capping operations between approximately buoy Red 42 and Red 12.

[mappress mapid=”19193″]

Press Release

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free