Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›CMP Finishes Pontoon Berthing Facility for DONG
Business & Finance

November 16, 2014 · about 11 years ago

CMP Finishes Pontoon Berthing Facility for DONG

DONG recently awarded Commercial Marine and Piling Ltd. (CMP) a contract to construct & install a complete berthing system for the crew transfer vessels in Barrow in Furness. The contract included dredging, socketing piles into rock and construction of heavy concrete pontoons on site and the fabrica

1 minutes read
  • LinkedIn
  • X
  • Email

DONG recently awarded Commercial Marine and Piling Ltd. (CMP) a contract to construct & install a complete berthing system for the crew transfer vessels in Barrow in Furness.

The contract included dredging, socketing piles into rock and construction of heavy concrete pontoons on site and the fabrication and installation of steel access platform and bridge. The pontoon facility was regularly tested close to its maximum design conditions on a number of occasions between December and February 14th.

Wind gusts of 45 m/s (160 km/h) were recorded locally (12.2.14) and waves in excess of 1.2 meters approaching from the south have been observed at the pontoon berthing facility on a number of days.

On 3rd January 2014 the highest ever recorded water level was experienced at Barrow with a high tide of more than 11 meters bringing the water level close to the top of the quay edge and the decks of the pontoons close to 1 meter from the tops of the piles.

The pontoon and services facility performed as designed and without problems. They demonstrated to be a very safe and stable berthing facility for use by DONG vessels and personnel in all weather conditions.

[mappress mapid=”19263″]

Source: cmp

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago

United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago
United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago