DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Newbury Flood Alleviation Scheme Completed
Business & Finance

November 26, 2014 · about 11 years ago

Newbury Flood Alleviation Scheme Completed

Construction of the Newbury flood alleviation scheme has been finished, according to the Environment Agency report. The work was delayed by high groundwater levels and high flows in the River Kennet during the winter of 2012 to 2013. Newbury has been vulnerable to river flooding. Its canal and river

2 minutes read
  • LinkedIn
  • X
  • Email

Construction of the Newbury flood alleviation scheme has been finished, according to the Environment Agency report. The work was delayed by high groundwater levels and high flows in the River Kennet during the winter of 2012 to 2013.

Newbury has been vulnerable to river flooding. Its canal and river banks and water levels are as much as 2.5 meters higher than the surrounding floodplain. There were floods in 1947, 1960, 2000 and 2003. Newbury has also experienced flooding from surface water and groundwater, most recently in 2007 and during the winter of 2013 to 2014. There is a separate investigation into these sources of flooding and what actions can be taken in the future.

The Newbury flood alleviation scheme was built by the Environment Agency and made up of flood defense work at 5 locations throughout Newbury town centre. It has been funded through Grant in Aid and third-party contributions from West Berkshire Council, Newbury Town Council and the Canal & Rivers Trust, local businesses and residents.

It was one of the first schemes to be delivered under the government’s flood and coastal resilience partnership funding policy, which was introduced in May 2011.

The Newbury flood alleviation scheme has been built to reduce the risk of river flooding to the town to a 1-in-100 (1%) chance of flooding in any 1 year. By investing £2 million in building the scheme, the Environment Agency estimates that it will avoid damages of £33.7 million over the lifetime of the flood defense.

[mappress mapid=”19386″]

Press Release

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free