Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Preparations Underway for Murray Mouth Dredging
Business & Finance

December 19, 2014 · about 11 years ago

Preparations Underway for Murray Mouth Dredging

During the next two weeks a dredging contractor will be setting-up at the Murray Mouth to undertake preparatory works prior to commencing dredging operations in the near future. The mouth is at risk of closing due to lower than average flows in the River Murray which has allowed sand to build up. De

2 minutes read
  • LinkedIn
  • X
  • Email

During the next two weeks a dredging contractor will be setting-up at the Murray Mouth to undertake preparatory works prior to commencing dredging operations in the near future.

The mouth is at risk of closing due to lower than average flows in the River Murray which has allowed sand to build up.

Department of Environment Water Resource Operations manager Jarrod Eaton said the situation has deteriorated rapidly this year, and the amount of sand inside the mouth is now close to the volume present when dredging was commenced in 2002 during the Millennium Drought.

“ Dredging is now necessary as South Australia will not receive enough water after Christmas to keep the mouth open, ” Mr Eaton said. “In the last month around 30,000 cubic meters of sand has accumulated inside the mouth.”

“It is important that the mouth remains open to allow the exchange of water between the Coorong and the Southern Ocean which helps to keep Coorong ecosystems healthy.

“Keeping the mouth open is a key objective of the Murray-Darling Basin Plan.

“While Basin Plan water recovery efforts are progressing well with around 1,900 gigalitres of water recovered across the Murray-Darling Basin to date, even when the Plan is fully implemented, dredging will still to be required on occasions .”

When dredging starts there will be some changes to public access and at times there may be restrictions on passage through the mouth and along Sir Richard and Younghusband Peninsula next to the mouth. Signage will be installed at boat ramps, along the beach and in other public places to inform people of any access restrictions.

While attempts will be made to minimize disruption to boat operators, at certain times there may be no public access to the Goolwa and/or Tauwitchere Channels and along the beach.

Dredging operations will continue to at least the end of June 2015 and regular updates will be provided throughout 2015.

[mappress mapid=”19586″]

Press Release

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceEquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

14 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

14 days ago