DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Swansea Maintenance Dredging Completed
Business & Finance

February 17, 2015 · about 11 years ago

Swansea Maintenance Dredging Completed

Progressive natural sedimentation upstream of the River Tawe Barrage in Swansea results in a gradual loss of depth for the Marina located in the sheltered waters above the barrage. Removal of the material is required every couple of years to restore safe navigation in the river. Dredging is carried

1 minutes read
  • LinkedIn
  • X
  • Email

Progressive natural sedimentation upstream of the River Tawe Barrage in Swansea results in a gradual loss of depth for the Marina located in the sheltered waters above the barrage.

Removal of the material is required every couple of years to restore safe navigation in the river.

Dredging is carried out in the winter months when impacts on the local environment and boat users are minimised. The preferred method of dredging used to date has been Water Injection Dredging (WID).

Van Oord’s purpose built WID vessel ‘Odin’ was working in the approaches to the upstream lock gates. The volume of sediment removed this year was approximately 12,000 m³. The works were carried out under a Marine Licence issued by National Resources Wales.

Dredging started of the 30th January and was successfully completed on 14th February. The work required very close co-operation between the various parties to ensure that the many vessels moored in the Marina could be moved out of the area to be dredged in a defined sequence.

All aspects of the work, including planning, licensing, surveys, contract documentation and on-site supervision were carried out by the Anthony D Bates Partnership (ADBP) LLP on behalf of City and County of Swansea.

[mappress mapid=”19933″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free