Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Port Everglades Expansion Study Wins Approval
Business & Finance

March 2, 2015 · about 11 years ago

Port Everglades Expansion Study Wins Approval

The U.S. Army Corps of Engineers, Jacksonville District, and Port Everglades have received unanimous approval from the Corps’ Civil Works Review Board for the Port Everglades Harbor Feasibility Study following their presentation in Washington, D.C. The board unanimously recommended that the Corps mo

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Jacksonville District, and Port Everglades have received unanimous approval from the Corps’ Civil Works Review Board for the Port Everglades Harbor Feasibility Study following their presentation in Washington, D.C.

The board unanimously recommended that the Corps move forward with the final state/agency review of the report.

This marks a significant milestone for the study and recommended navigation improvement plan, which includes deepening and widening the harbor. The report outlines the major national benefits of the project, including transportation cost savings and increased economic efficiency of the port.

The configuration of the current Federal project dates back to the 1980s, making it difficult to accommodate today’s larger container and tanker vessels. The port’s primary problems are channel and turning basins that don’t meet current world fleet requirements.

The existing channel project depth of 42-feet doesn’t provide adequate, safe depth for large tankers and container ships currently visiting the harbor. The next generation of container ships and oil tankers requires significantly more channel depth to operate efficiently.

Navigation is further challenged by strong and unpredictable cross currents in and near the outer entrance channel.

The study and recommended plan accommodates existing and future vessel movements, resolves navigation restriction problems, and presents opportunities for national economic development.

Since release of the draft feasibility study in June 2013, the Corps has continued consultation with state and federal agencies regarding the new endangered species coral listings, and refining the mitigation and monitoring plans.

The next step in the process is the final state and agency review in March, followed by completion of the Chief of Engineers Report in May 2015. The construction phase could take an additional five years, or more, depending on the funding stream and phasing of the work, which the Corps will address during the PED phase.

[mappress mapid=”20026″]

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago

United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago
United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago