Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›VIDEO: Sigmaplan – Flood Defense Plan
Business & Finance

March 5, 2015 · about 11 years ago

VIDEO: Sigmaplan – Flood Defense Plan

After the 1953 and 1976 North Sea floods, a flood defense plan, called the Sigma Plan, was conceived to protect the Flemish part of the Scheldt estuary against future storm surges. The plan is governed by Waterwegen en Zeekanaal NV (W&Z), a Flemish government agency and since 2005 aims to combine fl

2 minutes read
  • LinkedIn
  • X
  • Email

After the 1953 and 1976 North Sea floods, a flood defense plan, called the Sigma Plan, was conceived to protect the Flemish part of the Scheldt estuary against future storm surges.

The plan is governed by Waterwegen en Zeekanaal NV (W&Z), a Flemish government agency and since 2005 aims to combine flood defense with strengthening the river’s ecology through the creation of flood control areas.

Maintaining the navigability of inland waterways is also a key task of W&Z, whereby a huge amount of sediments are produced. W&Z set up a pilot project in Dendermonde, involving the construction of a compartment dyke of a flood control area using dredged material from the River Scheldt without intermediate storage between the dredging and the construction process.

Jan De Nul Group and its environmental subsidiary Envisan set out an extensive testing campaign to develop engineered sediments for use in the construction phase. This involved the testing of specific additives on the geotechnical characteristics of the dredged material.

Based on the results of the geotechnical dyke model and an economical appraisal, a specific combination was identified for large-scale use. After being mechanically dredged and transported by barges to a location near the flood defence works, the sediments are pumped ashore to the mixing plant.

The dredged material is delivered to a pontoon equipped with screens and a set of piston pumps able to push the relatively dry sediment approximately 600 m to the mixing plant.

To ensure that the dyke exhibits the performance as intended in the design calculations a Quality Assurance / Quality Control (QA/QC) program is installed. Multiple field tests are executed during construction to determine strength and permeability of the engineered sediments in the dyke body.

More info

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceEquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

14 days ago

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

14 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

14 days ago
Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

14 days ago