Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Ashtabula River Cleanup Pays Off
Business & Finance

March 15, 2015 · about 11 years ago

Ashtabula River Cleanup Pays Off

Water quality in the Ashtabula River and its tributaries has significantly improved since the water body was last tested in 2002, according to a new Ohio EPA report. Biological communities in the Ashtabula River have improved since the dredging of contaminated sediments and installation of habitat e

2 minutes read
  • LinkedIn
  • X
  • Email

Water quality in the Ashtabula River and its tributaries has significantly improved since the water body was last tested in 2002, according to a new Ohio EPA report.

Biological communities in the Ashtabula River have improved since the dredging of contaminated sediments and installation of habitat enhancements. Samples taken in 2011 show biological communities in the River main stem are very good to exceptional in quality.

Stream channel restoration activities and the removal of PCB-contaminated sediments and high concentrations of PAHs (polycyclic aromatic hydrocarbons) prior to 2003, and again in 2012 and 2013, are directly related to water quality improvements including those documented in the study .

Areas that still need attention are the Fields Brook and Strong Brook tributaries.

Recognizing the need for dredging and preferring the RAP type process over actions associated with Superfund site designation, local leaders formed the Ashtabula River Partnership in 1994 and the Ashtabula River Cooperation Group in 1997.

Private and public stakeholders worked together in these affiliations to produce the Ashtabula River Comprehensive Management Plan and Environmental Impact Statement in 2002. Concurrent passage of the Great Lakes Legacy Act enabled federal matching funds to become available for the dredging project in 2005.

The Ashtabula City Port Authority secured matching funds and provided leadership for the $60 million sediment remediation effort completed in 2008. The US Army Corps of Engineers completed an additional $15 million downstream dredging project to fully open passage to the Lake at the same time.

Remedial dredging efforts began in 2006 to remove over 500,000 cubic yards of contaminated sediment containing approximately 12.5 tons of hazardous PCBs (Ashtabula River RAP 2008).

Since 2008, $9.6 million in Great Lakes Restoration Initiative (GLRI) funding has been secured to continue dredging. Ohio EPA participated in the dredging projects with technical support, direct funding, and active participation at numerous meetings.

[mappress mapid=”20124″]

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago

United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago
United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago