DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›New Proposals for Beach Replenishment at Mudeford
Business & Finance

March 17, 2015 · about 11 years ago

New Proposals for Beach Replenishment at Mudeford

Although planning permission has already been granted for beach replenishment work that would take material from the sand bar off Mudeford Quay and spread it on Christchurch beaches, a new method of working is now being proposed which would be more beneficial. The original proposal may have caused d

1 minutes read
  • LinkedIn
  • X
  • Email

Although planning permission has already been granted for beach replenishment work that would take material from the sand bar off Mudeford Quay and spread it on Christchurch beaches, a new method of working is now being proposed which would be more beneficial.

The original proposal may have caused difficulties for vessels getting in and out of Christchurch harbor at low tide due to a pipeline being laid from the sandbar (also known as an ebb tide delta) to the beach at Gundimore.

The new proposal would see a channel being cut through the western end of the sandbar, which would be buoyed to mark its location. This would allow vessels access to the harbor without any danger of snagging the pipeline.

Lindsay Cass, Head of Property & Engineering at Christchurch Council , said: “The shape of the ebb-tide delta has changed recently, which is another reason for us looking at a different way of working. Previously it was about 400 meters long and 100 meters wide. It is now about 600 meters long but only 30 meters wide.

“The narrower and longer sand bar would make it difficult for the excavators originally proposed to work there safely ,” added Cass.

The proposal is for sand and shingle to be pumped from a dredger using a submersible pump alongside the sand bar via a floating pipeline to temporary lagoons on the beach.

[mappress mapid=”20133″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free