DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Sacramento Levee Plans up for Comment
Business & Finance

March 23, 2015 · about 11 years ago

Sacramento Levee Plans up for Comment

Recommendations for $1.46 billion in future improvements for Sacramento’s flood infrastructure are now open for public comment, described in two related reports by the U.S. Army Corps of Engineers, Sacramento District, state of California and the Sacramento Area Flood Control Agency (SAFCA). Both re

2 minutes read
  • LinkedIn
  • X
  • Email

Recommendations for $1.46 billion in future improvements for Sacramento’s flood infrastructure are now open for public comment, described in two related reports by the U.S. Army Corps of Engineers, Sacramento District, state of California and the Sacramento Area Flood Control Agency (SAFCA).

Both reports recommend seepage cutoff walls and levee raises for Sacramento River east levees and seepage cutoff walls and strengthening of Arcade Creek levees.

The Corps’ plan also proposes erosion protection work along the Sacramento and American rivers; levee improvements along north Sacramento’s Natomas East Main Drainage Canal and Dry, Robla and Magpie creeks; and would add greater resiliency and flexibility to the system by widening the Sacramento Weir and Bypass.

Previously-authorized seepage cutoff wall construction along the American River is scheduled to be completed in summer 2015.

“ We’ve made tremendous progress together in recent years upgrading Sacramento’s levee system and Folsom Dam, ” said Sacramento District Commander Col. Mike Farrell. “The proposed work continues long-planned improvements to modernize and strengthen the entire system, but it is just that – proposed. Now we need the community’s feedback.”

As with recent Natomas levee improvements, SAFCA’s plan recommends work that is in line with the larger-scale Corps and state proposal, and would begin construction in advance of Congressional authorization of federal involvement.

Public meetings will be conducted jointly by the Corps, SAFCA and state of California to provide information and answer questions about the relationship between the proposed plans and broader flood risk reduction efforts throughout the region.

[mappress mapid=”20176″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free