DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Draft Report Released for Southwest Coastal Study
Business & Finance

March 24, 2015 · about 11 years ago

Draft Report Released for Southwest Coastal Study

The U.S. Army Corps of Engineers, New Orleans District, has released its Southwest Coastal Louisiana Study Revised Integrated Draft Feasibility Report and Environmental Impact Statement for a 45-day public comment period. This report revises the draft “Southwest Coastal Louisiana Draft Integrated Fe

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, New Orleans District, has released its Southwest Coastal Louisiana Study Revised Integrated Draft Feasibility Report and Environmental Impact Statement for a 45-day public comment period.

This report revises the draft “Southwest Coastal Louisiana Draft Integrated Feasibility Report and Programmatic Environmental Impact Statement” previously released in December 2013 and contains modified Tentatively Selected Plans (TSP) for the National Economic Development (NED) and National Ecosystem Restoration (NER) components of the study.

The NED purpose is to reduce the risk of hurricane and storm surge and flood damages. The NED TSP still consists of a programmatic nonstructural plan for the flood proofing of eligible structures in the 25-year floodplain by various methods including the elevation of eligible residential structures, dry flood proofing of eligible non-residential commercial structures, and the construction of berms and floodwalls of less than six feet in height around eligible industrial complexes and warehouses.

The purpose of the NER portion of the plan is to restore environmental conditions for the Chenier Plain ecosystem. The NER TSP consists of 51 ecosystem restoration features that are now being recommended for construction, in addition to the recommendation for a long-range study of the Calcasieu Ship Channel salinity control structure.

Community members and stakeholders are invited to comment on the draft integrated feasibility report and environmental impact statement.

[mappress mapid=”20183″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free