Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›MFA Insists on Precision Dredging Techniques
Business & Finance

March 24, 2015 · about 11 years ago

MFA Insists on Precision Dredging Techniques

Maul Foster & Alongi, Inc. (MFA), a Pacific Northwest professional consulting firm, last month wrapped up the Lake River dredging project, located in Ridgefield, Washington. Sediment in Lake River was impacted by contaminants from a wood-treating operation that, from the 1960s through 1993, pressure

1 minutes read
  • LinkedIn
  • X
  • Email

Maul Foster & Alongi, Inc. (MFA), a Pacific Northwest professional consulting firm, last month wrapped up the Lake River dredging project, located in Ridgefield, Washington.

Sediment in Lake River was impacted by contaminants from a wood-treating operation that, from the 1960s through 1993, pressure treated poles and dimensional lumber with chemical preservatives.

The Port of Ridgefield and the Washington State Department of Ecology entered into a legal agreement in 2014 to collaborate on the cleanup efforts.

The cleanup scheme involved removing up to 100 old, treated wood pilings; dredging 10,000 cubic yards of contaminated sediment; placing a clean layer of sand in the river; stabilizing the bank with rounded cobbles; and revegetating 2.5 acres with native grasses and about 1,000 shrubs and trees.

MFA engineers insisted on applying “precision dredging” techniques in the design. This approach uses sophisticated global positioning system equipment to verify removal of toxic sediment, and a bucket design to limit disturbance and spreading of fine-grained sediment during construction.

The selected dredging method resulted in improved efficiencies during permitting; in a biological opinion, the National Marine Fisheries Service (NMFS) identified this approach as a desired method for minimizing the loss of sediment into the water column.

[mappress mapid=”20178″]

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceEquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

14 days ago

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

14 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

14 days ago
Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

14 days ago