DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USACE Sends Dredgers to Open Oregon Inlet
Business & Finance

March 30, 2015 · about 11 years ago

USACE Sends Dredgers to Open Oregon Inlet

If shoaling and weather conditions permit, the U.S. Army Corps of Engineers, Wilmington District, will begin emergency dredging operations at Oregon Inlet tomorrow to remove the shoaling that has been obstructing the federal channel passage for commercial fishing vessels. The U.S. Coast Guard recent

2 minutes read
  • LinkedIn
  • X
  • Email

If shoaling and weather conditions permit, the U.S. Army Corps of Engineers, Wilmington District, will begin emergency dredging operations at Oregon Inlet tomorrow to remove the shoaling that has been obstructing the federal channel passage for commercial fishing vessels.

The U.S. Coast Guard recently closed the Oregon Inlet waters near the Bonner Bridge to any vessels with a draft greater than two feet. Ships with a draft more than two feet are not allowed within 100 yards of the Bonner Bridge until further notice, the Coast Guard said.

The goal of the side cast dredge Merritt will be to open the federal channel at the navigation span of the Bonner Bridge to a controlling depth of 8 feet so the hopper dredge Currituck can work to open the channel to as great a depth as possible up to its authorized depth of 14 feet.

The most recent hydrographic survey conducted on March 27 showed the federal channel with a depth of six feet through the bridge fenders and less than 2 feet seaward of the span.

“ We recognize the importance of this gateway for vessels traveling in and out of the Oregon Inlet and will continue to do everything possible to re-open the channel, ” said Wilmington District Donnie Potter, Chief Physical Support Branch.

The Wilmington District estimates the cost of keeping the federal channel dredged to the depth needed for commercial vessels is from $7–8 million annually. The Corps was allocated $2 million in FY15 for the entire project of Manteo (Shallowbag Bay), not just Oregon Inlet.

[mappress mapid=”20223″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free