DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Final EA/EIR for Channels Maintenance Dredging
Business & Finance

May 4, 2015 · about 11 years ago

Final EA/EIR for Channels Maintenance Dredging

The Final Environmental Assessment/Environmental Impact Report (EA/EIR) for the Maintenance Dredging of the Federal Navigation Channels in San Francisco Bay, Fiscal Years 2015-2024 and Response to Comments has been released and is available online. The United States Army Corps of Engineers (USACE) a

1 minutes read
  • LinkedIn
  • X
  • Email

The Final Environmental Assessment/Environmental Impact Report (EA/EIR) for the Maintenance Dredging of the Federal Navigation Channels in San Francisco Bay, Fiscal Years 2015-2024 and Response to Comments has been released and is available online.

The United States Army Corps of Engineers (USACE) and San Francisco Bay Regional Water Quality Control Board (Regional Water Board) prepared the Draft EA/EIR to address the environmental effects of the proposed project.

These agencies prepared the Draft EA/EIR in accordance with the National Environmental Policy Act (NEPA) of 1969 and the California Environmental Quality Act (CEQA) of 1970, as well as implementing regulations and agency guidelines.

The report also describes changes made to the Draft EA/EIR in response to comments received. These modifications do not change the conclusions of the analysis presented in the Draft EA/EIR, and do not introduce significant new information on the project, project impacts, or mitigation that is substantially different from what was presented and analyzed in the Draft EA/EIR.

The Regional Water Board plans to consider certifying the EIR and adopting Reissued Waste Discharge Requirements and Water Quality Certification for the project at a public hearing on May 13.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Boskalis, McLaughlin & Harvey complete Dover land reclamation
  2. 2Jones Bros wraps up Kinmel Bay coastal defense project
  3. 3RSGT, CMA CGM, Mawani invest big in Jeddah Islamic Port’s Terminal 4
  4. 4Rohde Nielsen completes maintenance dredging at Costa da Caparica

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free