DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›FONSI for Decomp Physical Model Now Available
Business & Finance

May 20, 2015 · about 11 years ago

FONSI for Decomp Physical Model Now Available

The Draft Supplemental Finding of No Significant Impact (FONSI) for the Decomp Physical Model (DPM) is now available for public and agency review. Comments will be accepted through June 18, 2015. The Decomp Physical Model is a field-scale test that is being conducted along a 3,000-foot stretch of th

1 minutes read
  • LinkedIn
  • X
  • Email

The Draft Supplemental Finding of No Significant Impact (FONSI) for the Decomp Physical Model (DPM) is now available for public and agency review.

Comments will be accepted through June 18, 2015.

The Decomp Physical Model is a field-scale test that is being conducted along a 3,000-foot stretch of the L-67A and L-67C levees and canals in Water Conservation Area (WCA) 3A and 3B to determine how best to design and formulate plans for future decompartmentalization of WCA-3, as envisioned in the Comprehensive Everglades Restoration Plan (CERP).

Installation of the DPM was completed in October 2013. The first operational testing period was conducted from November – December 2013, and the second operational testing period was conducted from November 2014 – January 2015.

The Corps is proposing a third year of testing in 2015, with the potential for a fourth year of testing in 2016, to gain information to further address scientific, hydrologic and water management uncertainties that require clarification prior to the design of decompartmentalization features within WCA 3, included in CERP.

Water flow, stage, sediment movement, water quality, and ecological parameters will be measured during each operational test cycle.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Boskalis, McLaughlin & Harvey complete Dover land reclamation
  2. 2Jones Bros wraps up Kinmel Bay coastal defense project
  3. 3RSGT, CMA CGM, Mawani invest big in Jeddah Islamic Port’s Terminal 4
  4. 4Rohde Nielsen completes maintenance dredging at Costa da Caparica

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free