Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Damen Wins Dredger Order
Business & Finance

June 3, 2015 · about 11 years ago

Damen Wins Dredger Order

Argentinian company Cooperativa De Trabajos Portuarios Limitada de San Martín has ordered two Damen ASD 2810 tugs and one Cutter Suction Dredger 500. The two vessels and dredger are to be used in the Argentinian terminal region around Rosario on the Paraná river for towing, mooring, fire-fighting an

1 minutes read
  • LinkedIn
  • X
  • Email

Argentinian company Cooperativa De Trabajos Portuarios Limitada de San Martín has ordered two Damen ASD 2810 tugs and one Cutter Suction Dredger 500.

The two vessels and dredger are to be used in the Argentinian terminal region around Rosario on the Paraná river for towing, mooring, fire-fighting and dredging operations. The basic functions of the dredger will be capital and maintenance dredging.

The CSD 500 dredger, which will be built at Damen Dredging Equipment in Nijkerk, the Netherlands, has a dredging depth of 16m and a maximum swing width of 39.6m.

Its mixture capacity is 4,000m³/hour which can be discharged up to 2000m. The diameters of the suction pipe and discharge pipe are 550mm and 500mm respectively. The cutting power of the cutter is 180 kW.

The vessel is fitted with a Caterpillar 3512B dredge pump diesel and a Caterpillar C12 TA auxiliary diesel. Dimensions: length o.a. (including ladder): 39.00m; beam: 7.95m; draught: 1.00m; air draught (excluding spuds): 6.70m.

The CSD 500 is a modular design which can be easily disassembled for transportation anywhere in the world. Upon reaching its destination, the CSD 500 can be reassembled with locally sourced small cranes.

Delivery of the equipment is scheduled for Q3 2015.

[mappress mapid=”20602″]

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceEquipmentProject & TendersTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

14 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago
Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

14 days ago