DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Comments Invited on Chicago Dredged Material Plan
Business & Finance

June 9, 2015 · about 11 years ago

Comments Invited on Chicago Dredged Material Plan

The U.S. Army Corps of Engineers (USACE) yesterday released for public comment the “Chicago Area Waterways Dredged Material Management Plan and Integrated Environmental Assessment.” The plan contains recommendations for managing material dredged from the Calumet Harbor and River and the Calumet-Sag

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers (USACE) yesterday released for public comment the “Chicago Area Waterways Dredged Material Management Plan and Integrated Environmental Assessment.”

The plan contains recommendations for managing material dredged from the Calumet Harbor and River and the Calumet-Sag Channel for the next twenty-five years.

Calumet Harbor and River is located on Lake Michigan in the City of Chicago, Illinois.

Maintenance dredging of the channel produces an average yearly volume of approximately 50,000 cubic yards of material. The downstream Calumet-Sag Channel, part of the Illinois Waterway, includes both the Calumet-Sag and a portion of the Little Calumet River.

Approximately 30,000 cy of sediment is expected to be dredged from the Calumet-Sag Channel over the next 25 years. Levels of metals, PCBs and PAHs are sufficiently high to preclude unconfined placement of the river and channel sediment.

Currently, dredged sediment is placed in the Chicago Area Confined Disposal Facility (CDF), located at the mouth of the Calumet River. The CDF, which was built in 1984, is nearly at capacity, creating the need for a management plan for the material generated through ongoing maintenance dredging.

The proposed plan would include construction of a dredged material disposal facility on a currently vacant portion of the former Republic Steel Manufacturing Complex, located along the Calumet River at 122nd Street and Carondolet Avenue in Chicago, and closure of the existing Chicago Area CDF.

[mappress mapid=”20633″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Keyfield buys mega TSHD for $24.7M
  2. 2CHEC wins Escravos Channel dredging contract
  3. 3EXCLUSIVE: Eurovía del Guadalquivir dredging kicks off
  4. 4Brennan acquires Budrovich Contracting’s marine operations

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free