DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›New Report on Nicaragua Canal
Business & Finance

June 19, 2015 · about 11 years ago

New Report on Nicaragua Canal

A group of international scientists have released their findings about a proposed trans-isthmus shipping canal in Nicaragua, raising concerns about environmental impact and lack of information. The mega project would be built by the Nicaraguan government with the Hong Kong Nicaragua Canal Developmen

2 minutes read
  • LinkedIn
  • X
  • Email

A group of international scientists have released their findings about a proposed trans-isthmus shipping canal in Nicaragua, raising concerns about environmental impact and lack of information.

The mega project would be built by the Nicaraguan government with the Hong Kong Nicaragua Canal Development Company (HKND) and would exceed the Panama Canal in both size and capacity.

The environmental assessment report was conducted by Environmental Resources Management (ERM), a consultant firm hired by HKND.

In their report, the scientists at Florida International University (FIU) determined the ERM assessment does not adequately measure the potential impacts of the project, noting insufficient data collection on water quality, geology, sediments, species, erosion, and fisheries.

The scientists also note the time period in which the study was conducted, two years, is a shorter time frame than what is needed to adequately evaluate long-term impacts of such a large-scale infrastructure project.

“For a project of this magnitude with so much at stake, it seems that very careful and thorough consideration is a must, ” said Todd Crowl, workshop participant and director of FIU’s Southeast Environmental Research Center. “ The time frame was simply too short to fully understand the potential ramifications and likely outcome .”

A key concern is available water for the project. Silty sediments would be dredged in Lake Nicaragua for large shipping channels and water from the lake would be used to operate the canal’s locks. Because of Nicaragua’s strongly seasonal climate, which is subject to extreme events including drought and hurricanes, the scientists question the projected availability of water supplies.

Overall, the scientists address 15 areas of environmental concern in the report, including deforestation, the lack of long-term climate forecasts, and likely impacts on endangered plants and animals.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Keyfield buys mega TSHD for $24.7M
  2. 2CHEC wins Escravos Channel dredging contract
  3. 3EXCLUSIVE: Eurovía del Guadalquivir dredging kicks off
  4. 4Brennan acquires Budrovich Contracting’s marine operations

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free