DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Nishnabotna Bend EA Available
Business & Finance

June 24, 2015 · about 11 years ago

Nishnabotna Bend EA Available

A Draft Supplemental Environmental Assessment (EA) for repairs to the Nishnabotna Bend chute in Nemaha County, Neb. is currently available for public review. The EA evaluates the environmental impacts of repairing damages that occurred to the chute during the 2011 Missouri River flood. These repairs

1 minutes read
  • LinkedIn
  • X
  • Email

A Draft Supplemental Environmental Assessment (EA) for repairs to the Nishnabotna Bend chute in Nemaha County, Neb. is currently available for public review.

The EA evaluates the environmental impacts of repairing damages that occurred to the chute during the 2011 Missouri River flood. These repairs are needed to restore the intended habitat function of Nishnabotna Bend.

In 2004, Nishnabotna Bend was constructed between river miles 542.4-543.3 as a flow-through chute to function as shallow water habitat.

The unprecedented flood of 2011 eroded the upstream portion of the island created by the original project, allowing the river to bypass the originally constructed grade control structure near the upstream entrance of the chute.

Proposed repairs include a new grade control structure relocated farther downstream in the chute where the island has not eroded, two new stone toe revetments to stabilize the bank of the chute and the island, and repair of five existing spur dikes.

The grade control structure and spur dikes aid in slowing down water flow and decreasing depth in the chute to benefit the endangered pallid sturgeon and other native fish and wildlife without impacting the authorized purposes of the Missouri River.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Keyfield buys mega TSHD for $24.7M
  2. 2CHEC wins Escravos Channel dredging contract
  3. 3EXCLUSIVE: Eurovía del Guadalquivir dredging kicks off
  4. 4Brennan acquires Budrovich Contracting’s marine operations

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free