Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›All Ready for Wiggins Pass Dredging
Business & Finance

June 30, 2015 · about 11 years ago

All Ready for Wiggins Pass Dredging

Wiggins Pass Interim Channel dredging operations are scheduled to start next week. The dredging will be done from a barge due to sea turtle nesting season. The dredged beach quality shoaled sand will be removed from three shallow spots in the channel and placed in the water near Barefoot Beach Prese

1 minutes read
  • LinkedIn
  • X
  • Email

Wiggins Pass Interim Channel dredging operations are scheduled to start next week.

The dredging will be done from a barge due to sea turtle nesting season. The dredged beach quality shoaled sand will be removed from three shallow spots in the channel and placed in the water near Barefoot Beach Preserve in the flood shoal disposal area to help stabilize the mangroves.

A slower, more natural build up of the north side ebb shoal should reduce future interim dredging requirements.

The Board of County Commissioners approved the dredging back in April with the contract being awarded to Quality Enterprises. The project is expected to be completed in approximately three-to-four weeks after commencing, weather permitting.

In spring 2013, Wiggins Pass underwent maintenance dredging that straightened and removed 107,370 cubic yards of material from the pass. That dredging event was the first step in implementing a management plan that would provide a safe channel for boating; address erosion at Barefoot Beach Park; lengthen the dredge cycle while minimizing effects to the environment and provide a solution that is economically effective.

The Wiggins Pass Management Plan always anticipated lengthening the major dredge cycle to four years with a smaller interim dredge anticipated every two years. This interim dredging event, which has been programmed as a two year “cleanup” dredge, is limited in scope and will only address hot spot areas where sand has accumulated within the channel.

[mappress mapid=”20749″]

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago

United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago
United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago