Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Dutch Break Ground with New Invention
Business & Finance

July 9, 2015 · about 11 years ago

Dutch Break Ground with New Invention

Two Dutch companies, Van den Herik and Boskalis/Cofra, recently won contracts for the construction of a vertical geotextile screen in the berm of the river levee along the Nederrijn, near Opheusden, the Netherlands. Requested by the Rivierenland water board, the two companies developed their own tec

2 minutes read
  • LinkedIn
  • X
  • Email

Two Dutch companies, Van den Herik and Boskalis/Cofra, recently won contracts for the construction of a vertical geotextile screen in the berm of the river levee along the Nederrijn, near Opheusden, the Netherlands.

Requested by the Rivierenland water board, the two companies developed their own technology to construct such a screen that is specially designed to prevent piping, a phenomenon that occurs in case of abnormally high water levels and water seeps under the levee and starts carrying sand.

Both companies got a levee section of 500 m to proof they can place a vertical geotextile screen that stops the sand transport but allows the seepage water to flow through.

On 8 July, Boskalis/Cofra was world’s first to launch its new anti-piping technology based on a geotextile screen. Van den Herik will follow with a different geotextile-based technology in two months’ time.

Growing concern over piping

The most classical way to prevent piping is by widening the toe of the levee or by constructing a very deep pile sheet wall. The Rivierenland board studied cheaper and less space consuming alternatives and started experimenting with underground screens of geotextile that stop only the sand transportation, but not the flow of the seepage.

Convinced of its potential the water board invited Dutch civil engineering companies to develop a geotextile technology for anti-piping. As a result two companies have now been invited to place their screens over a length of 500 meters. Boskalis/Cofra is now world’s first to place such a screen.

Modular system geotextile plates

Boskalis and Cofra developed a modular system of geotextile plates that can be assembled into one screen. First a trencher digs a very small trench in the toe of the levee. One by one the geotextile plates are installed and looked together in the underground.

Van den Herik developed a technology with a special designed mobile construction that houses both the trencher and the large geotextile rolls. This machine can put the screen in place continuously, making it much faster. Another advantage of this technology that it uses geotextile on a roll that can be supplied by any producer.

The water board will monitor the performance of the screens with glass fiber cables that have been attached to the geotextile. The cable measures the temperature of the seepage water and in case of a free flow the water temperature will be low. In case of a clogging of the geotextile by sand, the water flow will stop and the temperature will go up.

[mappress mapid=”20819″]

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceResearch & Development

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Herman Senior lays keel for DP2 MPV Smokey at Albwardy Damen UAE
Research & Development

Herman Senior lays keel for DP2 MPV Smokey at Albwardy Damen UAE

about 7 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Herman Senior lays keel for DP2 MPV Smokey at Albwardy Damen UAE
Research & Development

Herman Senior lays keel for DP2 MPV Smokey at Albwardy Damen UAE

about 7 months ago