DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Zandvlei Dredging Kicks Off
Business & Finance

July 9, 2015 · about 11 years ago

Zandvlei Dredging Kicks Off

The City of Cape Town has begun with the maintenance dredging operation of the sand bar at the mouth of the Zandvlei Estuary, a 300-hectare nature reserve and recreational area of exceptional biodiversity. The build-up of sand in the estuary has occurred over the past 40 years. Although the accumula

1 minutes read
  • LinkedIn
  • X
  • Email

The City of Cape Town has begun with the maintenance dredging operation of the sand bar at the mouth of the Zandvlei Estuary, a 300-hectare nature reserve and recreational area of exceptional biodiversity.

The build-up of sand in the estuary has occurred over the past 40 years. Although the accumulation of sand has at times been interrupted by past dredging operations, it has been building up especially over the past decade.

The extra sediment has reduced flow and depth to the point where it restricts movement of fish into and out of the estuary and may increase the risk of flooding upstream. It also reduces the flushing of excess nutrients out of the estuarine system.

The accumulation of sand is the direct result of the rubble weir at the mouth of the estuary which, amongst others, had to be constructed to protect the sewer line.

Sediment taken during the dredging will be stored on both banks while drying and will then be removed for use in projects elsewhere as needed. A rehabilitation plan is also in place for banks that are damaged during operation of the dredging equipment, and they will be restored to a better condition than at the start of the project.

[mappress mapid=”20821″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Keyfield buys mega TSHD for $24.7M
  2. 2CHEC wins Escravos Channel dredging contract
  3. 3EXCLUSIVE: Eurovía del Guadalquivir dredging kicks off
  4. 4Brennan acquires Budrovich Contracting’s marine operations

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free