DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Fawn Island Project up for Comment
Business & Finance

July 14, 2015 · about 11 years ago

Fawn Island Project up for Comment

A draft supplemental environmental assessment for repairs to the Fawn Island chute in Harrison County, Iowa is currently available for public review. The EA evaluates the environmental impacts of repairing damages that occurred to the chute during the 2011 Missouri River flood. These repairs are nee

1 minutes read
  • LinkedIn
  • X
  • Email

A draft supplemental environmental assessment for repairs to the Fawn Island chute in Harrison County, Iowa is currently available for public review. The EA evaluates the environmental impacts of repairing damages that occurred to the chute during the 2011 Missouri River flood.

These repairs are needed to restore the intended habitat function of Fawn Island and prevent it from degrading further.

Proposed repairs include the construction of four stone revetments, totaling approximately 2,612 linear feet. Approximately 7,000 cubic yards of material would be removed in order to securely entrench the revetment toes.

Seventeen spur dikes would be created along these revetments to direct flows away from the bank and relieve pressure on the revetment. Approximately 24,260 tons of new quarried rock riprap would be required. Once the repairs are made, the chute would be reevaluated to determine whether it can be reopened to restore flow through the chute.

Repairs are being made under the Corps’ Missouri River Recovery Program, which helps to fulfill the requirements of the U.S. Fish and Wildlife Service’s 2003 Amended Biological Opinion for the Operation of the Missouri River Main Stem Reservoir System, Operation and Maintenance of the Missouri River Bank Stabilization and Navigation Project, and Operation of the Kansas River Reservoir System.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Keyfield buys mega TSHD for $24.7M
  2. 2CHEC wins Escravos Channel dredging contract
  3. 3EXCLUSIVE: Eurovía del Guadalquivir dredging kicks off
  4. 4Brennan acquires Budrovich Contracting’s marine operations

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free