DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Construction of Terminal 4 Kicks Off
Business & Finance

July 27, 2015 · about 11 years ago

Construction of Terminal 4 Kicks Off

DP World Chairman HE Sultan Ahmed Bin Sulayem, announced today the start of construction work on a brand new container terminal at Jebel Ali Port, Dubai. Phase 1 of the Container Terminal 4 (T4) project will deliver new capacity of 3.1 million TEU (twenty-foot equivalent units) by 2018, taking Jebel

2 minutes read
  • LinkedIn
  • X
  • Email

DP World Chairman HE Sultan Ahmed Bin Sulayem, announced today the start of construction work on a brand new container terminal at Jebel Ali Port, Dubai.

Phase 1 of the Container Terminal 4 (T4) project will deliver new capacity of 3.1 million TEU (twenty-foot equivalent units) by 2018, taking Jebel Ali Port’s total capacity to 22.1 million TEU.

The port complex will be equipped with at least 110 cranes with a total quay length of around 11,000 metres by that time. T4 will be located on a reclaimed island north of the existing Terminal 2 allowing DP World to further expand capacity to a total of 7.8 million TEU in line with market demand.

As part of the project, a bridge is being built to provide access to the island from land near Terminal 2.

Work is scheduled to get the 3,000 meter causeway and bridge partially open to traffic before the end of 2015.

HE Sultan Ahmed Bin Sulayem, Chairman of DP World , said: “ Given the strong economic outlook, both domestically and regionally, including the lead up to Dubai Expo 2020, we are delighted to announce the construction of Terminal 4, which will deliver new capacity of 3.1 million TEU in Phase 1.

“The new capacity is a response to feedback from customers expressing the need for more capacity at Jebel Ali due to an expected increase in trade in the run up to Expo 2020. Shipping lines will be able to bring more of the world’s largest vessels to our terminals so helping improve the efficiency of the region’s supply chain .”

Meanwhile, Jebel Ali and other DP World terminals in the UAE handled 7.9 million TEU in the first half of 2015, representing a growth of 6.0% compared with the first half of 2014.

HE Sultan bin Sulayem said: “ Jebel Ali continues to respond to market demand as we have in the past. Despite the addition of 2 million TEUs capacity in Terminal 3 scheduled in the second half 2015, the port still experiences high levels of utilisation.”

“With Jebel Ali’s total capacity set to reach 22.1 million TEU in 2018, we are ensuring our flagship asset in Dubai continues to have sufficient capacity to serve the future growth demand of the UAE and the wider region. ”

Terminal 4 will be equipped with semi-automated quay cranes, providing operational efficiencies for customers, comfortable and safe working conditions for employees and environmental benefits for the community at large by reducing the carbon footprint.

Under Phase 1, T4 will feature a 1,200 meter long quay with an 18 meter draft, and 13 of the world’s largest and most modern quay cranes, remotely operated from a sophisticated control room off the quayside.

Some 35 Automated Rail Mounted Gantry cranes (ARMG) will operate in the yard.

[mappress mapid=”20896″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Keyfield buys mega TSHD for $24.7M
  2. 2CHEC wins Escravos Channel dredging contract
  3. 3EXCLUSIVE: Eurovía del Guadalquivir dredging kicks off
  4. 4Brennan acquires Budrovich Contracting’s marine operations

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free