DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›TenCate Tubes Used for Bridge Construction
Business & Finance

July 28, 2015 · about 11 years ago

TenCate Tubes Used for Bridge Construction

Vietnam is building its longest sea-crossing bridge, the Lach Huyen bridge, near the city of Haipong. In order to construct the bridge, two land reclamation strips have been created to serve as work platforms. The 4.1 km long platforms were built by using TenCate’s Geosynthetics. The 5.44 km long br

1 minutes read
  • LinkedIn
  • X
  • Email

Vietnam is building its longest sea-crossing bridge, the Lach Huyen bridge, near the city of Haipong.

In order to construct the bridge, two land reclamation strips have been created to serve as work platforms. The 4.1 km long platforms were built by using TenCate’s Geosynthetics.

The 5.44 km long bridge, is set to open in February 2017 and will link Haiphong and capital city Hanoi to the new deep sea Lach Huyen port. The bridge will cross the estuaries of the rivers Bach Dang and Cam. It will also span a 500 m wide navigational channel.

To allow the bridge construction to be carried out on dry land, two works platforms were made on each side of the bay. The platforms were reclaimed along the alignment of the bridge, having a width of 26 m and 3.9 km in total length.

About 27 km of TenCate geotextile tubes were used as reclamation bund, segmentally stacked up to 5 layers high over intertidal soft clay deposits for the construction of the platforms.

Each tube is 50 meters in length and varying in diameter from 4.6 to 9.5 meters. No less than 500,000 cubic meters of sand was needed for building the works platforms.

Sand was dredged offshore and transported to the site using a combination of barging and hydraulic pumping for the construction of the platforms.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Keyfield buys mega TSHD for $24.7M
  2. 2CHEC wins Escravos Channel dredging contract
  3. 3EXCLUSIVE: Eurovía del Guadalquivir dredging kicks off
  4. 4Brennan acquires Budrovich Contracting’s marine operations

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free