Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Dredgers Departing the New Suez
Business & Finance

July 29, 2015 · about 11 years ago

Dredgers Departing the New Suez

There are only eight days are left before the opening of the New Suez Canal. Official unveiling ceremony of the new waterway, also known as the Suez Canal Corridor, will be held on the banks of the New Canal on August 6th where Egyptian President Abdel Fattah El-Sisi will be joined by world leaders

2 minutes read
  • LinkedIn
  • X
  • Email

There are only eight days are left before the opening of the New Suez Canal.

Official unveiling ceremony of the new waterway, also known as the Suez Canal Corridor, will be held on the banks of the New Canal on August 6th where Egyptian President Abdel Fattah El-Sisi will be joined by world leaders to witness the first ships traveling simultaneously north and south through the Red Sea – Mediterranean crossing.

The huge engineering project to build a new 72 km waterway, that will enable two-way traffic and double the current daily ship capacity, began with a national subscription to raise the necessary funds. In just six days, the Egyptian people managed to raise around $8.5 billion.

The construction of the project began on 6th August 2014 and despite initial estimates indicating that it would take three years to complete the project, it was finished in less than 12 months.

With some 43,000 workers, 80 contractors and six dredging companies, the project removed over 500 million cubic meters of soil including dry excavation works. Dredging works costed around 2.1 billion and included construction of a 37 km long new waterway as well as deepening and expanding the existing 145-year-old Suez Canal along its 35 km length.

Now, according to Chairman of the Suez Canal Authority Mohab Mamish, the dredging vessels that created this new waterway will be on their way home “in a day or two” after the minor adjustment to the canal are made.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago

United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago
United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago