DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Improvements in Murray Riverbank Stability
Business & Finance

August 4, 2015 · about 11 years ago

Improvements in Murray Riverbank Stability

A major review of the lower Murray River’s action plans has identified improvements in riverbank stability and vegetation in its upper reaches but further degradation in the lower reaches, according to Science Network WA. The Peel-Harvey Catchment Council (PHCC) has developed the 2014 River Action P

2 minutes read
  • LinkedIn
  • X
  • Email

A major review of the lower Murray River’s action plans has identified improvements in riverbank stability and vegetation in its upper reaches but further degradation in the lower reaches, according to Science Network WA.

The Peel-Harvey Catchment Council (PHCC) has developed the 2014 River Action Plan (RAP) with the Shire of Murray, Department of Water and the local community, assessing the previous 2003 RAP and setting priorities for future restoration.

The RAP forms part of the large-scale restoration project Rivers 2 Ramsar (R2R), to which the Australian Government has allocated more than $3.5 million from 2013-2017 to protect and enhance the Peel-Harvey Catchment.

Rivers 2 Ramsar project manager Thelma Crook said that they determined the lower reaches of the Murray River were impacted by high energy water movement and significant human use including boating.

“The added pressure from development and upstream land use has seen a reduction in water quality and a greater stress on both aquatic and terrestrial habitats, ” Ms Crook says.

R2R project officer Jo Garvey said that as a direct result of these findings, a bank stabilization project was implemented at Jeegarnyeejip Island in the lower reaches.

This project involved installing a synthetic erosion control matting designed to withstand higher-velocity water flows along a 1km stretch.

Past attempts using different bank stabilization methods found they were not effective in the lower reaches due to its heavy usage and system dynamics compared with the calmer upper reaches.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Keyfield buys mega TSHD for $24.7M
  2. 2CHEC wins Escravos Channel dredging contract
  3. 3EXCLUSIVE: Eurovía del Guadalquivir dredging kicks off
  4. 4Brennan acquires Budrovich Contracting’s marine operations

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free