DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Manchester Inner Harbor Projects Out for Review
Business & Finance

August 11, 2015 · about 11 years ago

Manchester Inner Harbor Projects Out for Review

The U.S. Army Corps of Engineers, New England District has received separate permit applications to conduct work in waters of the U.S. from a number of private owners along the Manchester Inner Harbor as well as permit applications by two marinas and the Town to dredge and retain some structures in

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, New England District has received separate permit applications to conduct work in waters of the U.S. from a number of private owners along the Manchester Inner Harbor as well as permit applications by two marinas and the Town to dredge and retain some structures in Manchester, Mass.

The work, including dredging, is proposed in the Manchester Inner Harbor at the 4 Ashland Avenue, 18 Bridge Street and 22 Bridge Street, all in Manchester. The dredged material will be disposed of in the ocean at the Massachusetts Bay Disposal Site (MBDS), located 12 nautical miles southeast of Gales Point.

The work at the McFadden property (4 Ashland Avenue) involves the retention of an unauthorized existing seasonal residential floating dock totaling approximately 672 square feet, now resting partially on intertidal habitat on timber skids and the new and maintenance dredging of approximately 1,460 square feet of intertidal habitat and 3,851 square feet of subtidal habitat to a depth of – 5 feet mean low water for vessel access to the dock.

The work at the Hahn-Crosby site (18 Bridge Street – 22 Bridge Street) similarly involves the retention of an unauthorized seasonal residential floating dock totaling approximately 432 square feet, now resting partially on intertidal habitat and the new and maintenance dredging of approximately 1,256 square feet of intertidal habitat and 983 square feet of subtidal habitat for vessel access to the dock.

Dredging of these projects will impact approximately 7,550 square feet of Essential Fish Habitat (EFH) for various species and life stages.

The Corps has made a preliminary determination that the site-specific adverse effect will not be substantial. Further consultation with the National Marine Fisheries Service regarding EFH conservation recommendations is being conducted and will be concluded prior to the final permit decision.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Keyfield buys mega TSHD for $24.7M
  2. 2CHEC wins Escravos Channel dredging contract
  3. 3EXCLUSIVE: Eurovía del Guadalquivir dredging kicks off
  4. 4Brennan acquires Budrovich Contracting’s marine operations

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free