Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Passaic River, Newark Bay Clean-Up Research
Business & Finance

August 18, 2015 · about 11 years ago

Passaic River, Newark Bay Clean-Up Research

This summer Portland State University (PSU) Civil and Environmental Engineering professors David Jay and Stefan Talke embark on a multi-year study to investigate the transport of contaminants in one of the most polluted Superfund sites in the United States. The goal of the study is to identify the m

2 minutes read
  • LinkedIn
  • X
  • Email

This summer Portland State University (PSU) Civil and Environmental Engineering professors David Jay and Stefan Talke embark on a multi-year study to investigate the transport of contaminants in one of the most polluted Superfund sites in the United States.

The goal of the study is to identify the most effective and practical remediation strategy tailored to the site’s unique environmental and human factors.

With a history that can be traced back to the beginning of the American Industrial Revolution, a significant amount of industrial pollution lies beneath the surface of Newark Bay and its tributary the 17-mile long tidal Lower Passaic River, part of the New York Harbor estuary system.

The Lower Passaic River itself is estimated to contain 9.7 million cubic yards of sediment contaminated by dioxins, PCBs, pesticides, hydrocarbons, mercury, lead, and other heavy metals in.

Typical remediation strategies for river clean-up include dredging, the removal of sediment from the river bottom, and/or capping and backfilling with clean sand to isolate contaminated areas. Because tidal currents move contaminants in all directions, including upstream, remediation of an estuary system is more complicated, resource intensive and expensive.

The Environmental Protection Agency (EPA) estimates that the cost of clean-up is likely to exceed $2.6 billion for just the lower eight miles of the Lower Passaic River, and projects that the cleanup process will take roughly 12 years.

Other experts estimate that EPA’s proposed process could take up to 25 years, because of the complexity of the site and the density of transportation infrastructure of northern New Jersey, which will be heavily disrupted by the clean-up.

PSU’s Jay and Talke, specialists in estuary systems science, estuarine physics, and retrospective modeling, will lead field work to collect data about important system properties including tides, currents, and sediment concentrations.

Collaborating with colleagues at the University of Illinois, this work will investigate which remediation strategies are likely to be the most successful given the circulation, sediment dynamics, and contaminant transport factors of the Lower Passaic River and Newark Bay.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceResearch & Development

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Damen Dredging delivers CSD simulator to BIWTA, Bangladesh
Dredging

Damen Dredging delivers CSD simulator to BIWTA, Bangladesh

about 2 months ago

Herman Senior lays keel for DP2 MPV Smokey at Albwardy Damen UAE
Research & Development

Herman Senior lays keel for DP2 MPV Smokey at Albwardy Damen UAE

about 7 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen Dredging delivers CSD simulator to BIWTA, Bangladesh
Dredging

Damen Dredging delivers CSD simulator to BIWTA, Bangladesh

about 2 months ago
Herman Senior lays keel for DP2 MPV Smokey at Albwardy Damen UAE
Research & Development

Herman Senior lays keel for DP2 MPV Smokey at Albwardy Damen UAE

about 7 months ago