DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Little Narragansett Bay Dredging Plan Unveiled
Business & Finance

August 31, 2015 · about 11 years ago

Little Narragansett Bay Dredging Plan Unveiled

The U.S. Army Corps of Engineers, New England District, is proposing maintenance dredging of rock and hard packed sand from portions of the Pawcatuck River, Little Narragansett Bay, and Watch Hill Cove Federal Navigation Project (FNP) in Westerly, Rhode Island, and Stonington, Connecticut. The state

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, New England District, is proposing maintenance dredging of rock and hard packed sand from portions of the Pawcatuck River, Little Narragansett Bay, and Watch Hill Cove Federal Navigation Project (FNP) in Westerly, Rhode Island, and Stonington, Connecticut.

The state of Rhode Island is the local sponsor for the proposed work.

This scheme involves maintenance dredging of up to 2,600 cubic yards of hard packed sand and approximately 750 to 1,000 cubic yards of rock and cobble material from this section of the project. The rocks are a navigational hazard at lower stages of the tide.

The proposed rock removal and dredging will remove hard packed sand and rocks from approximately 34,600 square feet of the authorized project area.

The authorized Federal navigation project provides for a 10-foot deep Mean Lower Low Water (MLLW) channel, 100-feet wide from Stonington Point through Little Narragansett Bay to Avondale, a length of about 3 miles, to the lower wharves in Westerly, a length of about 4 miles, and then 40-feet wide between lower and upper wharves of Westerly to 7-feet deep; a 10-foot deep channel, 100-feet wide, from the mouth of the river into Watch Hill Cove; a 16-acre anchorage basin in the Cove, 10-feet deep; and a 200-foot long riprap jetty near the southwest corner of the basin.

Dredging will be performed with a mechanical dredge, the government-owned “Snell.”

The government-owned special purpose hopper dredge “Currituck” will be used as the scow. The rock material (with some sand) will be placed adjacent to rock outcroppings off of the Maschaug area of Westerly, approximately 6 miles from the channel, seaward of the 30-foot depth contour.

Scows containing primarily sand will transit to a nearshore site off of Misquamicut Beach for placement.

The work is planned to take place over a three-week period during October 2015.

[mappress mapid=”21065″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Keyfield buys mega TSHD for $24.7M
  2. 2CHEC wins Escravos Channel dredging contract
  3. 3EXCLUSIVE: Eurovía del Guadalquivir dredging kicks off
  4. 4Brennan acquires Budrovich Contracting’s marine operations

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free