DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Work Begins on Oxford Scheme
Business & Finance

September 15, 2015 · about 11 years ago

Work Begins on Oxford Scheme

Ground investigations to determine the design and route of Oxford Flood Alleviation Scheme’s proposed flood relief channel began this week. Specialist contractors started work on digging 130 boreholes and trial pits yesterday on land between Oxford’s Botley Road and Sandford in Kennington, the 2 poi

1 minutes read
  • LinkedIn
  • X
  • Email

Ground investigations to determine the design and route of Oxford Flood Alleviation Scheme’s proposed flood relief channel began this week.

Specialist contractors started work on digging 130 boreholes and trial pits yesterday on land between Oxford’s Botley Road and Sandford in Kennington, the 2 points where the channel will leave and re-enter the River Thames.

The investigations will provide important data on the geology of the area. Monitors will be placed in some of the boreholes to provide additional information on groundwater levels and flows.

Joanna Larmour, Oxford Flood Alleviation Scheme Project Director, said: “ Added to information we gathered in 2009 the results of this work will give us a better understanding of the nature of the rock and soils underlying the area through which the flood relief channel will be excavated.”

Work will continue for about four weeks.

Background

The Oxford Flood Alleviation Scheme is a partnership project involving the Environment Agency, Oxfordshire County Council, Oxford City Council, Vale of White Horse Council, Oxford Flood Alliance, The Oxfordshire Local Enterprise Partnership and Thames Regional Flood and Coastal Committee.

The scheme is being developed to reduce flooding in Oxford by constructing new or enlarging existing channels in the floodplain to the west of the city at an estimated cost of £120 million.

[mappress mapid=”21167″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Keyfield buys mega TSHD for $24.7M
  2. 2CHEC wins Escravos Channel dredging contract
  3. 3EXCLUSIVE: Eurovía del Guadalquivir dredging kicks off
  4. 4Brennan acquires Budrovich Contracting’s marine operations

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free