DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USACE Releases Final EA for Columbia River
Business & Finance

October 11, 2015 · about 11 years ago

USACE Releases Final EA for Columbia River

The final environmental assessment for continued maintenance of the Columbia River federal navigation channel is available. The maintenance includes placement of dredged material on the eastern shoreline of Rice Island and re-handling material at an in-water site near Howard Island. The U.S. Army Co

1 minutes read
  • LinkedIn
  • X
  • Email

The final environmental assessment for continued maintenance of the Columbia River federal navigation channel is available.

The maintenance includes placement of dredged material on the eastern shoreline of Rice Island and re-handling material at an in-water site near Howard Island.

The U.S. Army Corps of Engineers will place material on the eastern end of Rice Island located near river mile 22, to rebuild and protect the existing upland placement site.

Placement of dredge material in this area may increase available forage area for streaked horned larks, which were listed as threatened under the Endangered Species Act in 2013.

In-water re-handling of dredged material will take place near Howard Island, located between river miles 68 and 69, because shoaling is consistently forming too far away from the island for a dredge to directly pump that material to the existing upland placement site.

Adding a sump will maximize efficiency of material placement at the existing Howard Island upland placement site.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Keyfield buys mega TSHD for $24.7M
  2. 2CHEC wins Escravos Channel dredging contract
  3. 3EXCLUSIVE: Eurovía del Guadalquivir dredging kicks off
  4. 4Brennan acquires Budrovich Contracting’s marine operations

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free