Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Rohde Nielsen to Dredge Gdansk New Turning Basin
Business & Finance

December 1, 2015 · about 10 years ago

Rohde Nielsen to Dredge Gdansk New Turning Basin

Port of Gdansk Authority (PGA SA) and the Polish-Danish consortium of PRCiP and Rohde Nielsen A/S have signed an agreement for a new turning basin in the port. The agreement – concluded on November 25th 2015 between the PGA SA, PRCiP (Przedsiebiorstwo Robot Czerpalnych i Podwodnych) and Rohde Nielse

1 minutes read
  • LinkedIn
  • X
  • Email

Port of Gdansk Authority (PGA SA) and the Polish-Danish consortium of PRCiP and Rohde Nielsen A/S have signed an agreement for a new turning basin in the port.

The agreement – concluded on November 25th 2015 between the PGA SA, PRCiP (Przedsiebiorstwo Robot Czerpalnych i Podwodnych) and Rohde Nielsen – is for the dredging of the turning basin located between the Ore Pier, the Southern Breakwater and the boundary of the existing fairway to the DCT 1.

Following the deepening, the depth of the basin will be increased to 16.5 meters, allowing the passage of vessels with a draft of up to 15 meters. The new basin will cover an area of 22.4 hectares.

During the works, more than 1 600 000 m³ of material will be excavated from the bottom of the basin. Before the dredging could start, a ferromagnetic study of the bottom – an engineering survey – will be conducted along with the removal and neutralization of potential localized dangerous substances.

An additional requirement of the agreement is constant archaeological supervision of the operation. After the completion of the dredging operation, the area will be demarcated with navigation buoys in accordance with the requirements of the Maritime Office in Gdynia.

The deadline for the completion of works, which are estimated to cost around $5.5 million, is August 2016.

[mappress mapid=”21603″]

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago

United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago
United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago