DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Waal Project Reduces Flood Risk in Nijmegen Area
Business & Finance

December 3, 2015 · about 10 years ago

Waal Project Reduces Flood Risk in Nijmegen Area

Minister Melanie Schultz van Haegen (Infrastructure and the Environment) and Hubert Bruls, Mayor of Nijmegen, pulled a life-size thumb out of a dyke yesterday to illustrate the fact that the River Waal now has more room around Nijmegen. As a result, the water level of the river has dropped by 34 cen

2 minutes read
  • LinkedIn
  • X
  • Email

Minister Melanie Schultz van Haegen (Infrastructure and the Environment) and Hubert Bruls, Mayor of Nijmegen, pulled a life-size thumb out of a dyke yesterday to illustrate the fact that the River Waal now has more room around Nijmegen.

As a result, the water level of the river has dropped by 34 centimeters.

The Nijmegen Room for the Waal project is one of the largest projects being realized within the framework of Rijkswaterstaat’s national Room for the River flood risk management program.

By widening the river, the risk of Nijmegen and the surrounding upriver area becoming flooded, today or in the future, has been considerably reduced.

The Waal takes a sharp bend near Nijmegen and becomes narrower, forming a bottleneck. At times of high water, the river could not cope with the volume of water. To protect residents from flooding, the dyke has been moved 300 meters inland and a 4-kilometer-long secondary channel has been dug. This has created an island in the center of the city.

Three new bridges connect the island to Nijmegen-Noord.

The work started in January 2013. Fifty households had to be relocated as a result of the flood risk management measures.

Minister Schultz said: “ A unique urban river park has been created in Nijmegen: the Spiegelwaal and the Veur Lent island are part of a plan in which flood risk management and urban quality go hand in hand. In the 1995 flooding, Nijmegen residents were up to their neck in water. Now, the Waal can cope with a similar volume of water with no problem at all. Nijmegen is prepared for future high water levels caused by climate change.”

Special components of the Room for the Waal project:

[mappress mapid=”21615″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Keyfield buys mega TSHD for $24.7M
  2. 2CHEC wins Escravos Channel dredging contract
  3. 3EXCLUSIVE: Eurovía del Guadalquivir dredging kicks off
  4. 4Brennan acquires Budrovich Contracting’s marine operations

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free