DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Dredger Fernao de Magalhaes Arrives in Saint-Nazaire
Business & Finance

December 14, 2015 · about 10 years ago

Dredger Fernao de Magalhaes Arrives in Saint-Nazaire

The Jan De Nul’s cutter suction dredger Fernao de Magalhaes arrived in Saint-Nazaire on 10th December for a series of repairs. These operations, including sheet metal work, geo-mechanical inspections and the renovation of the hull, will be carried out by Eiffel Industrie Marine (EIM) in the Louis Jo

1 minutes read
  • LinkedIn
  • X
  • Email

The Jan De Nul’s cutter suction dredger Fernao de Magalhaes arrived in Saint-Nazaire on 10th December for a series of repairs.

These operations, including sheet metal work, geo-mechanical inspections and the renovation of the hull, will be carried out by Eiffel Industrie Marine (EIM) in the Louis Joubert dock.

The Louis Joubert Lock, also known as the Normandie Dock, is a lock and major dry dock located in the port of Saint-Nazaire, in Loire-Atlantique northwestern France.

Before entering the dock, the dredger was relieved of her three 47-meter piles weighing 200 tonnes each, which are required to maintain the dredger’s stability during the dredging operations.

Unloaded using the jumbo derrick, the piles were then transferred to shed B, which has been transformed into a sheet metal shop for the duration of this technical stop.

It was therefore necessary to adapt the building (removing the steps, modifying the framework, etc.) to accommodate these very large elements and to allow the EIM technicians to work on the pile screwing system.

Following this rejuvenation, the dredger Fernao de Magalhaes should leave Saint-Nazaire on 15th January 2016.

[mappress mapid=”21676″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Keyfield buys mega TSHD for $24.7M
  2. 2CHEC wins Escravos Channel dredging contract
  3. 3EXCLUSIVE: Eurovía del Guadalquivir dredging kicks off
  4. 4Brennan acquires Budrovich Contracting’s marine operations

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free