DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USACE Awards Contract for Los Angeles River Barrier Installation
Business & Finance

January 13, 2016 · about 10 years ago

USACE Awards Contract for Los Angeles River Barrier Installation

The USACE awarded a $1.3 million contract to JF Engineering on January 9 to install roughly 3 miles of temporary protective barriers to increase bank height along the most vulnerable reaches of the LA River that will restore channel capacity and reduce the risk of flooding to homes and businesses. T

1 minutes read
  • LinkedIn
  • X
  • Email

The USACE awarded a $1.3 million contract to JF Engineering on January 9 to install roughly 3 miles of temporary protective barriers to increase bank height along the most vulnerable reaches of the LA River that will restore channel capacity and reduce the risk of flooding to homes and businesses.

The Corps conducted a review of existing conditions of the flood risk management systems it oversees.

In total, 11 dams, one debris basin and more than 50 miles of channel within the Southern California region were evaluated for this storm season.

The review resulted in interim risk reduction measures to establish a consistent flow rate, or conveyance capacity, along Corps operated and maintained reaches of the Los Angeles River.

The Corps has identified measures for channelized areas along the Los Angeles River from approximately Griffith Park to Elysian Valley, including the Glendale Narrows area, which pose the greatest risk of flooding to adjacent communities during large storm events.

A combination of factors, including design capacity and the presence of vegetation growth and sediment accumulation, contributes to reduced water flow in these areas.

The work on the project will start this week.

[mappress mapid=”21805″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Keyfield buys mega TSHD for $24.7M
  2. 2CHEC wins Escravos Channel dredging contract
  3. 3EXCLUSIVE: Eurovía del Guadalquivir dredging kicks off
  4. 4Brennan acquires Budrovich Contracting’s marine operations

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free