Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Donjon Marine Wraps Up Flushing Bay Dredging
Business & Finance

January 14, 2016 · about 10 years ago

Donjon Marine Wraps Up Flushing Bay Dredging

The U.S. Army Corps of Engineers, New York District, recently completed the Flushing Bay and Creek Federal Navigation Channel Maintenance Dredging Project, with the removal of approximately 135,000 cubic yards of dredged material. “We’re proud to have completed this significant project on time, with

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, New York District, recently completed the Flushing Bay and Creek Federal Navigation Channel Maintenance Dredging Project, with the removal of approximately 135,000 cubic yards of dredged material.

“ We’re proud to have completed this significant project on time, within budget and in an environmentally responsible manner, ” said Col. David Caldwell, commander, New York District . “ As stewards of our Nation’s waterways, we’ve improved the channel’s functionality, allowing for safe passage of vessels moving throughout the Flushing Bay and Creek federal navigable waters.”

New York District awarded a $10.1 million contract to Donjon Marine Co. Inc., Hillside, NJ, for the removal of dredged material in order to return the channel to its authorized depth of 15 feet.

The material dredged from the channel was a mixture of sand, silt, and clay. This material has been beneficially reused for placement at an upland site in Sayreville, NJ. A closed environmental clamshell bucket was used during the dredging project to ensure compliance with the State-issued Water Quality Certification.

The Flushing Bay Federal Channel supports 14 marine terminals that receive and ship sand, stone, and petroleum products by barge, with approximately 1,425,000 tons of cargo transported through the channel annually.

[mappress mapid=”21811″]

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago

United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago
United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago