DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Michigan Governor Calls for Second Poe-Sized Lock
Business & Finance

January 21, 2016 · about 10 years ago

Michigan Governor Calls for Second Poe-Sized Lock

A second Poe-sized Lock is critical to the future of Michigan and the United States declared Michigan Governor Rick Snyder in his State of the State address on January 19. Gov. Snyder pledged to work with Congress to build the second lock. He noted that 4,000 commercial vessels transit the locks at

1 minutes read
  • LinkedIn
  • X
  • Email

A second Poe-sized Lock is critical to the future of Michigan and the United States declared Michigan Governor Rick Snyder in his State of the State address on January 19.

Gov. Snyder pledged to work with Congress to build the second lock. He noted that 4,000 commercial vessels transit the locks at Sault Ste. Marie, Michigan, each year, but most of the tonnage goes through the Poe Lock because it can accommodate the largest and most efficient vessels.

“ The Poe Lock is absolutely critical to our future. What would happen if that one lock went down?, ” the Governor continued.

A second Poe-sized lock was authorized by Congress first in 1986, and then again in 2007, but funds for the $590 million project have not been appropriated. “ This is something we need to work with Congress on and getting done. ”

The Soo Locks connect Lake Superior to the lower four Great Lakes and St. Lawrence Seaway. Iron ore for the steel industry is the primary cargo moving through the locks. Gov. Snyder stressed that the country would “ run out of steel ” if the Poe Lock failed.

Although authorized by Congress, construction of the lock has been stalled by a flawed benefit/cost (b/c) analysis. However, the U.S. Army Corps of Engineers has recently agreed to re-evaluate the project. Industry is calling on the Corps to fast track the analysis.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Keyfield buys mega TSHD for $24.7M
  2. 2CHEC wins Escravos Channel dredging contract
  3. 3EXCLUSIVE: Eurovía del Guadalquivir dredging kicks off
  4. 4Brennan acquires Budrovich Contracting’s marine operations

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free