DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›American’s Patriot Starts Annual Grays Harbor Dredging
Business & Finance

January 22, 2016 · about 10 years ago

American’s Patriot Starts Annual Grays Harbor Dredging

The U.S. Army Corps of Engineers’ contractor began annual maintenance dredging of the federal navigation channel in Grays Harbor Inner Harbor Sunday, January 17, 2016. Tacoma-based American Construction Co., is contracted for $4 million to dredge up to 475,000 cubic yards of material in the inner ha

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers’ contractor began annual maintenance dredging of the federal navigation channel in Grays Harbor Inner Harbor Sunday, January 17, 2016.

Tacoma-based American Construction Co., is contracted for $4 million to dredge up to 475,000 cubic yards of material in the inner harbor near Aberdeen, Wash., working through 14 February 2016.

American’s Patriot dredge will place material at the existing South Jetty nourishment site and Washington State Department of Natural Resources-managed Point Chehalis open water disposal site.

Inner harbor dredging is confined to the currently maintained -36 feet mean lower low water (MLLW) depth. As part of the Grays Harbor Navigation Improvement Project, a contract to dredge to the fully authorized -38 feet MLLW, is currently being developed.

According to the Corps, the next round of dredging operations, including the authorized additional two feet, should start in October in the vicinity of South Reach upstream to Cow Point Reach where the Port of Grays Harbor Terminal 4 is located.

The channel requires annual dredging to allow shipping from the Pacific Ocean to the navigation channel head at Cosmopolis, Wash. Shoaling, sedimentation filling in the channel, reduces the ability of ships to enter and leave safely under full load or during low tide conditions.

[mappress mapid=”21843″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Keyfield buys mega TSHD for $24.7M
  2. 2CHEC wins Escravos Channel dredging contract
  3. 3EXCLUSIVE: Eurovía del Guadalquivir dredging kicks off
  4. 4Brennan acquires Budrovich Contracting’s marine operations

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free