DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USACE Revises Proposal for Maintenance Dredging of Milford Harbor
Business & Finance

February 2, 2016 · about 10 years ago

USACE Revises Proposal for Maintenance Dredging of Milford Harbor

The U.S. Army Corps of Engineers, New England District, is revising its proposal for maintenance dredging of portions of the Milford Harbor Federal Navigation Project in Milford, Conn. The proposed work involves removal of approximately 14,000 cubic yards of sandy material from portions of the 10-fo

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, New England District, is revising its proposal for maintenance dredging of portions of the Milford Harbor Federal Navigation Project in Milford, Conn.

The proposed work involves removal of approximately 14,000 cubic yards of sandy material from portions of the 10-foot entrance channel of the Federal navigation project in Milford Harbor.

The city of Milford has requested this dredging and is the local sponsor for this proposed work.

A public notice was issued by the Corps for this proposed work on September 24, 2015. While the dredging site, amount and method remains the same as outlined in that notice, the nearshore disposal site off Bayview Beach has been shifted to the north and east in order to avoid shellfish beds.

“Natural shoaling processes and storm events have reduced available depths in the 10-foot-deep entrance channel in Milford Harbor to as shallow as –1 foot mean lower low water, ” said Project Manager Jack Karalius, of the Corps’ New England District, Programs and Project Management Division in Concord, Mass.

“Given these conditions and current vessel drafts, shoaling within the project is limiting safe navigation.”

Without dredging, channel conditions will continue to deteriorate, which will deter and/or interfere with the use of the river and harbor by recreational and commercial vessels.

Contingent upon receiving the necessary approvals, maintenance dredging will be completed using the government-owned special purpose dredge, the Currituck, or a similar dredge. The dredged material will be placed in the nearshore environment, in an area approximately 3,200 feet long by 800 feet wide, off of Bayview Beach in Milford, approximately one mile to the east.

The Corps favors using the nearshore placement areas option because it is environmentally-sound, cost-effective and keeps the clean sediments in the littoral system.

[mappress mapid=”21888″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Keyfield buys mega TSHD for $24.7M
  2. 2CHEC wins Escravos Channel dredging contract
  3. 3EXCLUSIVE: Eurovía del Guadalquivir dredging kicks off
  4. 4Brennan acquires Budrovich Contracting’s marine operations

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free