DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Port of Gothenburg in Expansion Mode
Business & Finance

March 3, 2016 · about 10 years ago

Port of Gothenburg in Expansion Mode

The Port of Gothenburg, the largest port in Scandinavia, is set to expand with the construction of a new terminal at the outer port area. The terminal will be built using dredging spoils and is expected to be completed at some point after 2020. The Land and Environment Court has granted the Port of

2 minutes read
  • LinkedIn
  • X
  • Email

The Port of Gothenburg, the largest port in Scandinavia, is set to expand with the construction of a new terminal at the outer port area.

The terminal will be built using dredging spoils and is expected to be completed at some point after 2020.

The Land and Environment Court has granted the Port of Gothenburg consent to build a new freight terminal beside the existing terminals.

“We are extremely pleased to receive this decision, which will strengthen Gothenburg as the logistics capital of the Nordic region. The terminal is an important part of our future expansion and will present us with an opportunity to handle the increase in demand for sea transport via the Port of Gothenburg, ” said Magnus Kårestedt, Port of Gothenburg chief executive.

The maximum draught for vessels calling at the terminal will be 11 meters.

This means that traffic will probably take the form of intra-European freight transport – either as a final destination or to the major transshipment hubs in northern Germany, the Netherlands and Belgium for onward movement to various parts of the world.

Built using dredging spoils

The new terminal will be built using dredging spoils from maintenance dredging that is taking place throughout the port area. The spoils will be deposited in an embanked area in the bay at Arendal and will be made solid by being mixed with cement.

“By using dredging spoils in the construction, we can reuse material that would otherwise be simply sent to landfill, ” said Magnus Kårestedt.

Once the new port area has been constructed, eelgrass will disappear from the seabed. Eelgrass is an important part of the marine ecosystem and acts as a nursery for several species of fish.

[mappress mapid=”22041″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Keyfield buys mega TSHD for $24.7M
  2. 2CHEC wins Escravos Channel dredging contract
  3. 3EXCLUSIVE: Eurovía del Guadalquivir dredging kicks off
  4. 4Brennan acquires Budrovich Contracting’s marine operations

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free