DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Wetlands International: First Sediment Build-Up Behind Dam
Business & Finance

March 4, 2016 · about 10 years ago

Wetlands International: First Sediment Build-Up Behind Dam

A year after Dutch and Indonesian partners began the restoration of the severely eroding coast in Demak and Semarang in Northern Java, the project is showing its first results. Based on the principle of through Building with Nature, a sediment-permeable dam has been constructed and mangrove trees ha

2 minutes read
  • LinkedIn
  • X
  • Email

A year after Dutch and Indonesian partners began the restoration of the severely eroding coast in Demak and Semarang in Northern Java, the project is showing its first results.

Based on the principle of through Building with Nature, a sediment-permeable dam has been constructed and mangrove trees have been planted.

The first measurements show 45 centimeters of sedimentation. Behind one of the dams the mangrove seedlings are already emerging everywhere.

It is expected that if the dam structure stays in place, there can be a small forest in that area within a year or two. The mangrove forest should then take over the role of the dams and attenuate the waves and keep the sediment in place.

The project will run till 2020.

Evaluation of first year

The results of the first year are promising and the approach of Building with Nature is rapidly gaining in popularity.

During this first year, the project has been able to assess the condition of the coastline and the possible use of the Building with Nature approach for 8 villages, which is always site-specific and requires a thorough understanding.

In the most heavily eroded parts of the Demak coastline, this program is building permeable dams to attenuate the waves and trap the sediment.

This reverses the massive erosion and stimulates the natural re-growth of the mangrove greenbelt.

The program also has the intention to address the complex issue such as land subsidence as a result of extraction of ground water by industries, in particular at the rapidly eroding coast in the South, bordering the city of Semarang.

[mappress mapid=”22051″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Keyfield buys mega TSHD for $24.7M
  2. 2CHEC wins Escravos Channel dredging contract
  3. 3EXCLUSIVE: Eurovía del Guadalquivir dredging kicks off
  4. 4Brennan acquires Budrovich Contracting’s marine operations

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free