DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Remediation Option Finalized for Lower Passaic River
Business & Finance

March 6, 2016 · about 10 years ago

Remediation Option Finalized for Lower Passaic River

The Environmental Protection Agency (EPA) has issued its final Record of Decision for the Christie Administration’s selected remediation plan for the Lower Passaic River. The DEP issued a letter of concurrence to EPA last week, calling for the engineered, bank-to-bank capping of the lower 8.3 miles

2 minutes read
  • LinkedIn
  • X
  • Email

The Environmental Protection Agency (EPA) has issued its final Record of Decision for the Christie Administration’s selected remediation plan for the Lower Passaic River.

The DEP issued a letter of concurrence to EPA last week, calling for the engineered, bank-to-bank capping of the lower 8.3 miles of the river, and the dredging of approximately 3.5 million cubic yards of material to prevent flooding and enable future navigational use of the lower 1.7 miles of the river.

Additionally, none of the dredged material will be disposed in local landfills or in Newark Bay.

The material will be taken to out-of-state treatment facilities or landfills. The Christie Administration’s position has been that off-site disposal is the only viable option, so that the dredged, contaminated sediment is permanently removed from the community and properly secured in an appropriate facility.

The EPA’s announcement of the proposed remedy in April, 2014 came after years of study by EPA and its contractors, as well as detailed peer review by the EPA’s Contaminated Sediments Technical Advisory Group and its National Remedy Review Board, plus an independent team of modeling experts.

The final Record of Decision was reached after EPA’s public comment process, which included public hearings on the proposed remedy. Throughout the process, which included the development of a Focused Feasibility Study for the lower eight miles of the Passaic River, DEP worked closely with EPA to advance the project.

With the Record of Decision finalized, EPA will next seek funding for the implementation of the preferred remedy from the companies it deems responsible for the contamination.

New Jersey’s selected cleanup remedy is based on the belief that the remedial action for the Passaic River must:

[mappress mapid=”22057″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Keyfield buys mega TSHD for $24.7M
  2. 2CHEC wins Escravos Channel dredging contract
  3. 3EXCLUSIVE: Eurovía del Guadalquivir dredging kicks off
  4. 4Brennan acquires Budrovich Contracting’s marine operations

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free