Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›VIDEO: Damen DOP Dredger Working in Peru
Business & Finance

April 12, 2016 · about 10 years ago

VIDEO: Damen DOP Dredger Working in Peru

Reservoirs are notoriously tricky to maintain: from the surrounding area plenty of sand and silt is brought in by the river and the material deposits at the dam. As reservoirs are usually rather deep, dredging can be quite a challenge. For the Tablachaca dam in Peru another challenge was added; the

1 minutes read
  • LinkedIn
  • X
  • Email

Reservoirs are notoriously tricky to maintain: from the surrounding area plenty of sand and silt is brought in by the river and the material deposits at the dam. As reservoirs are usually rather deep, dredging can be quite a challenge.

For the Tablachaca dam in Peru another challenge was added; the location high up in the Andes required a modular dredger due to transport restrictions.

For this challenging task, Damen recently delivered its DOP dredging package to the area.

The set included a DOP350L dredge pump which has a mixture pumping capacity of 2.400 m3/h as well as the diesel hydraulic power pack which drives the DOP submersible dredge pump, plus the hoisting winch.

This winch enables the DOP submersible dredge pump to be lowered on a cable to a dredging depth of -35 m. Moreover, a jetwater pump unit was delivered for supplying the DOP’s suction head with pressurized water.

The modularly constructed DOP dredger furthermore included a standard Damen operator cabin, an A-frame for lowering the DOP pump plus the wires and sheaves to do so, as well as dredging instrumentation.

On deck, a separate unit is located housing flow and density meter, which gives the operator a clear view of the dredging process.

The DOP dredger 350L was commissioned in February by Damen Field Service Engineers.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceEquipmentTechnologyVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

12 days ago

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

13 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

12 days ago
Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

13 days ago