DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Bourne Scheme Includes Dredging and Beach Nourishment
Business & Finance

April 20, 2016 · about 10 years ago

Bourne Scheme Includes Dredging and Beach Nourishment

Michael Leitzel, representing the town of Bourne Selectmen, is seeking a permit from the USACE, New England District, to conduct work in waters of the U.S. in conjunction with dredging and disposing of material as beach nourishment in Bourne, Mass. The work is proposed in Little Bay Channel, Pocasse

1 minutes read
  • LinkedIn
  • X
  • Email

Michael Leitzel, representing the town of Bourne Selectmen, is seeking a permit from the USACE, New England District, to conduct work in waters of the U.S. in conjunction with dredging and disposing of material as beach nourishment in Bourne, Mass.

The work is proposed in Little Bay Channel, Pocasset Harbor at Barlows Landing and the Pocasset River in Bourne.

The proposed work involves maintenance and improvement dredging with beach nourishment. The project will use a hydraulic cutterhead dredge, the Barnstable County Dredge, to perform the work.

The dredged material will be used as beach nourishment at Monument Beach, Mashnee Island Causeway Beach and Barlows Landing Beach.

Any dredged material found to be unsuitable for beach nourishment will be used as daily cover at the Bourne Landfill. Dredged material from Little Bay will be transported to the Pocasset River Dewatering site, dewatered, and used as beach nourishment on Monument Beach and Mashnee Island Causeway Beach.

Dredged material from Pocasset Harbor will be transported to the Barlows Landing Dewatering Area, dewatered and transported to Barlows Landing Beach for beach nourishment.

Material from the Pocasset River will be transported to the Pocasset River Dewatering Area, dewatered and then trucked to the Bourne Landfill where it will be used as daily cover.

Maintenance dredging totals are 34,020 cubic yards. Improvement dredging totals are 6,860 cubic yards. The combined total is 40,880 cubic yards.

[mappress mapid=”22240″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Keyfield buys mega TSHD for $24.7M
  2. 2CHEC wins Escravos Channel dredging contract
  3. 3EXCLUSIVE: Eurovía del Guadalquivir dredging kicks off
  4. 4Brennan acquires Budrovich Contracting’s marine operations

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free