DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›City of Renton to Dredge Lower Cedar River
Business & Finance

May 9, 2016 · about 10 years ago

City of Renton to Dredge Lower Cedar River

The City of Renton (WA) is working on a project that will dredge 1.25-mile stretch of the lower Cedar River this summer, reducing the risk of seasonal flooding in the area. The city has selected the Coast and Harbor Engineering (CHE) team to assist with planning, permitting, developing plans and spe

1 minutes read
  • LinkedIn
  • X
  • Email

The City of Renton (WA) is working on a project that will dredge 1.25-mile stretch of the lower Cedar River this summer, reducing the risk of seasonal flooding in the area.

The city has selected the Coast and Harbor Engineering (CHE) team to assist with planning, permitting, developing plans and specifications for the Cedar River Maintenance Dredge Project.

According to the officials, the project is expected to cost somewhere between $7.8 million – $8.6 million.

The purpose of the Cedar River Maintenance Dredge Project is to perform future maintenance dredging in the lower Cedar River from the mouth of the Cedar River to the Williams Street Bridge in order to reduce flood risks to private, public, and commercial properties.

This project includes removing river sediments of approximately four feet settled in the channel, repairing unstable banks developed since the last dredging, replanting, exporting sediments offsite, and removing invasive vegetation in areas adjacent to the levee and floodwall. The project will also include a mitigation element to be determined during the permitting process.

The scheme – funded by the King County Flood Control District’s (KCFCD) Capital Improvement Project budget and the City’s KCFCD Opportunity Fund – is anticipated to be constructed between June 15 and August 31, 2016.

[mappress mapid=”22323″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Keyfield buys mega TSHD for $24.7M
  2. 2CHEC wins Escravos Channel dredging contract
  3. 3EXCLUSIVE: Eurovía del Guadalquivir dredging kicks off
  4. 4Brennan acquires Budrovich Contracting’s marine operations

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free