DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USACE Celebrates Completion of Riverside Drive Scheme
Business & Finance

May 10, 2016 · about 10 years ago

USACE Celebrates Completion of Riverside Drive Scheme

The U. S. Army Corps of Engineers, Nashville District, and the city of Clarksville recently celebrated the completion of the Riverside Drive Stream Bank Stabilization Project with a ceremony at Freedom Point in Liberty Park. The city of Clarksville and the Corps collaborated to stabilize 1,530 feet

2 minutes read
  • LinkedIn
  • X
  • Email

The U. S. Army Corps of Engineers, Nashville District, and the city of Clarksville recently celebrated the completion of the Riverside Drive Stream Bank Stabilization Project with a ceremony at Freedom Point in Liberty Park.

The city of Clarksville and the Corps collaborated to stabilize 1,530 feet of eroded bank on the Cumberland River alongside Riverside Drive to protect businesses along Riverside Drive, utilities and the Old Waterworks building, a local well-known historic landmark built in 1927.

Bank erosion threatened to undermine Riverside Drive, underground sewer lines, power poles, storm water drains, a guard rail, and a historic building. If left unprotected the Riverside Drive could have failed and posed danger to life and safety, and impacted the city and local businesses situated along the roadway.

Choctaw Transportation Inc., completed the project three months ahead of schedule. The $2.3 million project began in January 2016 and consisted of repairing eroding bank along the Cumberland River. The contractor added five feet of clay and rock to reinforce the stream bank.

Crews cleared and prepared the site and used barges equipped with backhoe tractors to place a layer of geotextile fabric and riprap with limestone rock to stabilize the eroding bank.

The estimated loss and relocation costs for all endangered facilities would have been $6.3 million. The federal government paid 65 percent and the city of Clarksville the remaining 35 percent in cost sharing the project. The overall cost of the project is more than $2.3 million, and the grant that the city received from the federal government pays more than $2.1 million of it.

[mappress mapid=”22337″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Keyfield buys mega TSHD for $24.7M
  2. 2CHEC wins Escravos Channel dredging contract
  3. 3EXCLUSIVE: Eurovía del Guadalquivir dredging kicks off
  4. 4Brennan acquires Budrovich Contracting’s marine operations

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free