DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Grafton Flood Risk Reduction Project on the Table
Business & Finance

May 17, 2016 · about 10 years ago

Grafton Flood Risk Reduction Project on the Table

The U.S. Army Corps of Engineers, Omaha District, is evaluating a Department of the Army (DA) permit application from the City of Grafton for the proposed Grafton Flood Risk Reduction Project. The application is being evaluated under Section 404 of the Clean Water Act which regulates the discharge o

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Omaha District, is evaluating a Department of the Army (DA) permit application from the City of Grafton for the proposed Grafton Flood Risk Reduction Project.

The application is being evaluated under Section 404 of the Clean Water Act which regulates the discharge of dredged or fill material in waters of the United States.

Approximately 1,500 residential, commercial and public structures will be removed from the regulated floodplain by constructing a 2.9–mile long bypass channel to divert Park River flows around the city when they exceed 2,000 cfs.

In addition, 9.3 miles of earthen tieback levees will be constructed to protect the city from overland flow. Construction will result in 12.4 acres of permanent and 18.0 acres of temporary wetland impacts.

Approximately 1,310 linear feet of the Park River will be permanently and 540 linear feet will be temporarily impacted. The city proposes to mitigate permanent wetland impacts along the sideslopes of the bypass channel.

Deadline for sending written comments is June 10, 2016.

[mappress mapid=”22375″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Keyfield buys mega TSHD for $24.7M
  2. 2CHEC wins Escravos Channel dredging contract
  3. 3EXCLUSIVE: Eurovía del Guadalquivir dredging kicks off
  4. 4Brennan acquires Budrovich Contracting’s marine operations

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free