Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Students Tour Rossall Sea Defenses
Business & Finance

May 19, 2016 · about 10 years ago

Students Tour Rossall Sea Defenses

Students and lecturers from the School of Engineering at the University of Central Lancashire have visited Rossall to see the work being done on the to sea defenses. Wyre Council is replacing two kilometers of defenses from Rossall Hospital to Rossall Point in a £63 million coastal defense scheme th

2 minutes read
  • LinkedIn
  • X
  • Email

Students and lecturers from the School of Engineering at the University of Central Lancashire have visited Rossall to see the work being done on the to sea defenses.

Wyre Council is replacing two kilometers of defenses from Rossall Hospital to Rossall Point in a £63 million coastal defense scheme that will protect 7,500 properties from the risk of flooding.

325,000 tonnes of rock armor are being used to create the base of the defenses, to weather the harsh conditions on this exposed part of the coastline and allow the beach to build up in the area.

Between the rock revetment and the promenade, specially manufactured precast concrete is being used to form a stepped revetment to break the waves. The promenade will look similar in design to Cleveleys.

Chris Pye, Senior Lecturer in Building Surveying , said: “ Site visits are an important part of the learning strategy for these degree programs as they help to reinforce what is taught in lectures as well as expose students to a working construction site environment which they may not have experienced before .”

“ The Rossall coastal defense scheme is also unique in its design and implementation as all coastal defense schemes are designed to suit local site conditions, so having this virtually on our doorstep is too good an opportunity to miss. ”

To date around 150,000 tonnes of rock have been placed in both the lower revetment and groynes. Over 1300 meters of steel piles have been installed, 300 precast concrete units including access steps, wave walls and revetment units are in place and 226,000 tonnes of rock have been imported.

The Fylde Peninsula Coastal Program (FPCP) is a partnership between Wyre Council, Blackpool Council, Fylde Council and the Environment Agency. FPCP successfully secured £86 million from the Department for Environment, Food and Rural Affairs to fund improvements to sea defenses at Rossall and Anchorsholme.

[mappress mapid=”22392″]

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago

United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago
United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago